Poor quality work
Conservatory roof conversion started 12/05/25 for a job that should have taken from between 2 to 3 days it was completed on 30/07/25 and the scaffolding removed on 02/08/2025. The roof on the inside of the conservatory had to be partially removed to rectifythe lights that were left permanantly on, the roof tiles were not fitted correctly and had to be removed and refitted, the roof hip tiles were squashed down and fitted without end caps, they had difficulty fitting the quadrant and it was left with drilled holes in it and 4 used damaged ridge tiles were used (these were the tiles that were originally the hips tiles). The work was recctified and finally completed.